A reorder point is a number in units, not a feeling: the units you expect to sell while a replacement is on its way, plus a buffer for the weeks that run hotter than forecast. Max is that number plus one order cycle. Set both per SKU on a fixed calendar and the "should I reorder this?" conversations mostly disappear. Set them per model — or in dollars — and they drift away from what the shelf is doing, toward too much of the wrong colourway.
This is written for buyers, store owners and distributors running a folding knife assortment on min/max. Prices below are published retail prices from the current Artisan Cutlery and CJRB catalogue; counts are from that catalogue today. Wholesale pricing, MOQ and lead time are quoted per program, so the arithmetic runs on your own cost and your supplier's written terms.
Why the unit beats the dollar
A dollar-based reorder point has to be recalculated every time a price moves, and knife prices move often — a promo, a steel tier, a handle swap. Units do not move when the price does: the same reorder point survives a price change and answers the only question a purchase order has to answer, which is how many. Cash constrains the order; it is a bad unit of decision, because the constraint changes weekly while demand does not.
The arithmetic, in the order you have to do it
Three inputs, one output. The inputs:
- Velocity. Units per week over a window long enough to include a seasonal swing. Twenty-six weeks is the working minimum; twelve weeks is a record of the last promotion.
- Lead time. Weeks from releasing the order to the units being sellable — not the day the carton hits your dock.
- Variability. The standard deviation of weekly units. Demand averaging ten a week and swinging between four and eighteen needs a much bigger buffer than demand averaging ten and swinging between nine and eleven.
Then the two equations that matter:
Reorder point = (average weekly units × lead time in weeks) + safety stock
Safety stock = z × standard deviation of demand over the lead time
Max = reorder point + order quantity
The z term is the service level you have chosen to run: about 1.28 for 90%, 1.65 for 95%, 2.33 for 99%; the safety stock literature covers the derivation if you want it. For a lead time longer than a week, scale the weekly deviation by the square root of the lead time — three weeks is √3, not 3 — because independent weeks partly cancel. The order quantity can come from economic order quantity, but in a knife store the binding constraints are usually the case pack, cash and shelf inches.
| Field | What goes in it | What breaks when it is missing |
|---|---|---|
| SKU or MPN | The exact variant, not the model family | The file averages several velocities into one and orders the wrong colourway |
| 26-week unit history | Weekly units shipped, by SKU | A short window imports the last promo as baseline demand |
| Weekly average and deviation | Total ÷ weeks, and the spread of those weeks | Erratic SKUs get the same buffer as steady ones |
| Lead time, in weeks | Order release to sellable on shelf | Every stockout lands in the same week of the next cycle |
| Deviation over lead time | Weekly deviation × √(lead-time weeks) | Safety stock is wildly over- or under-stated |
| Service level and z | A chosen number, written down | Buffer size becomes an accident of who bought that month |
| Order quantity | A case multiple, capped by cash and space | Orders arrive in quantities that match neither freight nor shelving |
| Max and review date | Reorder point + order quantity; a date, not an intention | No ceiling turns a good month into an overstock quarter, and stale parameters age out |
Lead time is the number dealers get wrong
There are three lead times and only one is quoted. Supplier processing is what a program tells you. Inbound transit is what the freight lane does. Receiving lag is your own back room — the days between the carton landing and the units being tagged and shelved. Using the supplier's best case produces a reorder point that is structurally too low, which surfaces as a stockout in roughly the same week every quarter, then an expedited order that eats the margin the SKU was meant to make.
Ask for a lead time as a midpoint and a range, in writing, then measure your own receipts for two cycles. A program that quotes a range instead of one number is telling you something useful: variation exists, and planning for it is your job.
Variant granularity: where most min/max files go wrong
Of the 430 folding models in the current catalogue, 251 are sold as a single variant and 179 as more than one; one model carries eight. Across those models there are 825 variants — and a reorder point set at model level is an average of several genuinely different velocities, which hides exactly what a buyer needs to see.
Two examples make the point. The Predator ATZ-1706P is a D2 blade on G10 at $48.09–$55.49; the Predator ATZ-1706G is S35VN on titanium at $162.49–$187.49. Same model name, different customer, price and velocity — and a different reorder point. The Shark ATZ-1707P runs $35.00–$48.95 across four variants of one listing, two steel tiers under an identical silhouette: two SKUs sharing a display slot, each with its own sell-through.
The rule: min/max belongs on the variant, not the model. A model-level number over-orders the slow variant and under-orders the anchor, and both errors cost money in opposite directions — one in markdown, the other in lost sales.
ABC by picks, not by price
Sort every SKU by units shipped over 26 weeks, cumulatively. The top 20% of SKUs by count usually carries most picks: those are A items, the next 30% are B, the rest C. Then attach a cadence and service level to each class:
- A items — weekly review, 95% or better, counted exactly. Forecast error is small, so safety stock is cheap and a stockout is expensive.
- B items — biweekly or monthly, 90–95%. This is where a parameter left alone for two quarters quietly becomes wrong.
- C items — quarterly, 90% or lower, ordered to the case multiple. Accepting a higher stockout rate is the point: a deep C-item buffer costs more than occasionally saying no.
Price is a poor substitute for velocity when classifying, and the catalogue shows why. Of 430 folding models, 127 sit between $150 and $249.99 while only 18 sit below $35: the catalogue skews high, a retailer's assortment should not. A store whose picks concentrate in the $35–$60 band is running a business whose A items are cheap, and classifying by price would put its fastest movers in C.
| Published retail band | Folding models | Observed range | Median | Reorder posture that usually fits |
|---|---|---|---|---|
| Under $35 | 18 | $29.99–$34.99 | $33.98 | Two or three SKUs carry the entry price, so they need A-item cadence despite thin unit margin |
| $35–$59.99 | 181 | $35.00–$59.99 | $49.99 | The volume band: the discipline is cutting tail SKUs, not adding them |
| $60–$99.99 | 52 | $60.19–$99.99 | $71.65 | Step-up band: slower turns, higher unit margin — biweekly, shallow buffers |
| $100–$149.99 | 34 | $107.24–$149.99 | $128.55 | Buy narrow: one or two SKUs, case quantity, lower service level |
| $150–$249.99 | 127 | $159.99–$249.99 | $199.99 | Display-driven: reorder behind demonstrated demand, not ahead of it |
| $250 and up | 18 | $266.65–$645.00 | $399.75 | Order-to-customer or single units; cash per unit makes a speculative buffer indefensible |
Stockout cost is the other half of the decision
Two kinds of stockout, two costs. A substitution — the customer buys another knife you do have — costs the margin difference between the two. A walkout costs the full unit margin plus whatever they would have bought with it. Measure both at the till for a month: how often does someone ask for a SKU you do not have, and what do they do next? That ratio, not a preference, sets the service level.
The arithmetic is unforgiving in one direction: going from 95% to 99% multiplies buffer units by roughly 2.33 ÷ 1.65 — about 41% more safety stock for four points of availability. Worth paying where walkouts are frequent and unit margin is large; not worth paying on a $35 knife the customer happily swaps for the model beside it.
Max is a cash decision as much as a demand one: it caps the order at the quantity you can exit at full price within the season, which is the point at which a healthy SKU stops becoming a markdown. Order in the case multiple, because freight and receiving are charged per shipment rather than per unit, and accept that on a thin rung the case pack often decides max outright.
Five SKUs that show the three postures
| Model | Blade | Steel | Handle | Published retail | Why it sits where it does |
|---|---|---|---|---|---|
| CJRB Ria J1917 | 2.95 in | 12C27 | G10 | $32.98 | Entry-price A item: two variants, weekly attention |
| Shark ATZ-1707P | 3.94 in | D2 or S35VN by variant | G10 | $35.00–$48.95 | One listing, two steel tiers: two reorder points, one display slot |
| Orthodox ATZ-1817P | 3.54 in | D2, HRC 59–61 | G10 | $52.49 | Volume band reference: biweekly review, steady demand |
| Sirius 1849P-DDRC | 3.54 in | S35VN, HRC 59–61 | Micarta | $128.55 | Single-variant step-up: case quantity, one buffer unit |
| Proponent ATZ-1820G | 3.85 in | S35VN, HRC 59–61 | Titanium | $212.87 | Case-stock item: reorder after demonstrated interest |
The shape matters more than the models: one entry-price SKU needing cadence, one listing hiding two SKUs, one volume reference, one single-variant step-up, one case-stock item — each with a different review frequency. A single monthly pass over all five is why stores carry overstock and stockouts in the same month.
The thirty-minute monthly review
- Pull 26 weeks of weekly units per SKU. Not revenue, not units per model.
- Recompute velocity and deviation. Flag any SKU whose deviation rose by a quarter or more — that is a promo, a defect or a new competitor, and all three need a decision.
- Apply a seasonal index where you have two cycles of data. One cycle is a guess.
- Mark 90-day zero-movers for markdown, not reorder. A SKU that has not turned in a quarter will not be rescued by a lower reorder point.
- Update max only where cash is tight. Churning parameters monthly has its own cost: the people ordering stop trusting the file.
- Write down what changed. Next month starts from the note, not from memory.
What to ask before you set the numbers
Five questions, all answered in writing, because each one changes the reorder point:
- What is the quoted lead time as a midpoint and a range, measured from order release to ship?
- What is the case pack or order multiple, and can a partial case ship?
- Will the SKU stay stable across runs — same MPN, finish and handle material — so a reorder matches the last batch?
- Are backorders held, or does a short line cancel?
- Can the program hold a reference unit from a batch, so consistency questions are settled by comparison rather than argument?
Wholesale pricing, MOQ and lead time are quoted per program, and those answers are what turn a worksheet into a working min/max file. Get them before the first order, not after the first stockout.
The discipline is unglamorous: measure units, put the buffer where the variability is, put the cadence where the picks are, and let cash decide the ceiling. Run that way, an assortment needs fewer emergency orders and carries less dead stock — and the saving shows up as working capital.
Apply to Become an Artisan Dealer
Specifications and prices are published retail data from the Artisan Cutlery and CJRB catalogue and are subject to change; counts reflect the listing at the time of writing. Wholesale pricing, MOQ, lead time and program terms are quoted per program. Service levels, lead times and cost inputs in any min/max file are the retailer's own.








Leave a comment
This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.